Capital Improvement Projects

List of capital improvement projects (CIP).        

CIP 8135B - 4140 SW Watson Ave Stormwater Outfall to Beaverton Ck Retrofit

Status: Current project

Project Category: Storm

Project Estimated Cost: $2,500,000

Project Description

Regional public stormwater treatment facility to help promote redevelopment in an area that is targeted for increased density and pedestrian connectivity according to the Central City Strategy of the Civic Plan, including portions of SW Canyon Rd.

Comments

Construction of Phase Two anticipated to start in May of 2023

Project Manager(s)

Tamara Connolly, 503-350-4025
mailboxengineering@beavertonoregon.gov

Project Schedule

FY17-18: Began RFP QBS process in Mar 2018. FY18-19: Select consultant and complete design. FY19-20: Construction of the off-street vault portion of the project. FY20-21: Complete the second phase of the storm drain design in the Watson Street Right-of-Way with expanded scope of relocation/reconstruction of: 1) approximately 135 feet of 12-inch sanitary sewer with an 18-inch sanitary sewer and realigning approximately 70 feet of 30-inch trunk sanitary sewer in Millikan Way (an activity funded by Clean Water Services), and 2) replacement of several segments of existing eight-inch water line with a new twelve-inch water line. FY22-23 and FY 23-24: Finish construction of the second phase. Current anticipated completion date is late fall of 2023

Project Justification

This regional facility will collect and treat stormwater runoff from a 91.5 acre area of the Central Beaverton Urban Renewal District that will see multiple redevelopment projects and allows them to be built or redeveloped without having to provide on-site stormwater runoff treatment. As a result, the design principles outlined in the Beaverton Downtown Code could more easily occur. In addition, larger regional facilities provide efficient operations and maintenance.

Project Image(s)

CIP 8135B Project Map for Beaver Creek area near SW Hall Blvd and Watson Ave, bounded by Canyon Rd, Crescent St, Hall Blvd, Stott and Erickson Avenues.

CIP 8135B Project Map for Beaver Creek area near SW Hall Blvd and Watson Ave, bounded by Canyon Rd, Crescent St, Hall Blvd, Stott and Erickson Avenues.



List of capital improvement projects (CIP).