Capital Improvement Projects

List of capital improvement projects (CIP).        

CIP 8098B - Dover North Utility Rehabilitation

Status: Current project

Project Category: Storm

Project Estimated Cost: $1,200,000

Project Description

Rehabilitate, replace, and/or realign sanitary sewer and storm drain pipes that are both old and difficult to access for maintenance.

Project Manager(s)

Tristan Wear, 503-350-4059
mailboxengineering@beavertonoregon.gov

Project Schedule

FY15/16 through FY16/17: Project placed on hold
FY17/18 through FY18/19: Continue design
FY 19/20: Project assigned to new Project Manager
FY 20/21: Begin investigation
FY 21/22: Design
FY 22/23: Design & Construction
FY 23/24: Complete Construction

Project Justification

Storm Drainage: Existing storm pipes are in need of repair and replacement. Many of the storm pipes are difficult to access because they are along sideyards and backyards.

Sanitary Sewer: The sanitary sewer pipe is made from transite and some of it has reached the end of its useful life. The sanitary sewer pipes will not need full rehabilitation, but there are several locations where the pipe is broken, and those selected spots will be repaired. Wastewater from this area flows into the City of Portland’s collection system making it ineligible for sewer lateral replacement under the CWS I & I reduction program.

Project Image(s)

CIP 8098B Project Map for area east of SW Oleson Rd including SW Dover St, Dover Ct and Dover Ln.



List of capital improvement projects (CIP).