Capital Improvement Projects

List of capital improvement projects (CIP).        

CIP 6105 - SW 131st, Barlow to Hanson, Sanitary Sewer Inflow and Infiltration Reduction Project

Status: Current project

Project Category: Sanitary

Project Estimated Cost: $400,000

Project Description

An I & I study was completed in 2022 covering the areas south of Allen Blvd to SW Hart Rd and from SW Hyland Way to SW Hall Blvd. The study area was divided into 6 sub-basins according to monitor flow at these locations. The sub-basins were then ranked according to the percentage of rainfall infiltrating into the city sanitary sewer system. The sub-basin determined to have the highest I & I was selected as the top priority which is the neighborhood along SW 131st Ave between SW Barlow Rd to SW Hanson Rd.

Project Manager(s)

Eduardo Rojas Roman, 503-000-6433
mailboxengineering@beavertonoregon.gov

Project Schedule

FY 20-21 Preliminary Design (Research)
FY 21-22 Continue Preliminary Design (Research) by collecting data from flow monitors installed by Clean Water Services throughout Erickson Sewer Basins 3 and 4. Finalize the Project Charter and begin IGA agreement document with CWS.
FY 22-23 Finalize IGA Agreement with CWS.
FY 23-24: Begin the Investigation Phase of 131st, Barlow to Hanson Sanitary Sewer Inflow and Infiltration Reduction Project
FY 24-25: Begin the Design Phase of 131st, Barlow to Hanson Sewer Project (sub-basin of the most problematic area of the basin). Additional IGA agreement to be completed for Construction.
FY 25-26: Begin Construction Phase. The Construction of the first phase will follow as Phase 1B.
FY 23-24: Design of SW 131st Ave, Barlow to Hanson
FY 24-25: Finalize design and construction plan set. Complete specs for advertisement.
FY 25-26: Construction of Sanitary Sewer project and post-construction investigation

Project Justification

There are sanitary sewer mainlines and laterals that are allowing groundwater to infiltrate into the sewer system. The goal of this project is to reduce flows from inflow and/or infiltration by repairing or replacing public sanitary sewer mainlines and manholes and additionally private sanitary laterals and side sewers.

Project Image(s)

CIP 6105 Sanitary Sewer project map for area bounded by SW Wilson Ave, SW Allen Blvd, SW Lombard and SW Greenway Blvd.



List of capital improvement projects (CIP).