FTR 6101 - Murrayhill Trunk Upsizing

Status: Future project

Project Category: Sanitary

Project Estimated Cost: $1,085,952

Project Description

The Murrayhill Trunk Upsizing project is located in a logistically challenging setting. The pipes are located in a heavily wooded area outside of the right-of-way, and a portion of the sewer pipes is aligned under a pond in the Murrayhill Open Space. East of the pond, the pipe is aligned adjacent to Summer Creek. Trenchless replacement methods are recommended for this project.

Project Manager(s)

Tristan Wear, 503-350-4059
mailboxengineering@beavertonoregon.gov

Project Schedule

The engineering for this project will begin in fiscal year 2025/26.

Project Image(s)

CIP 6101 Sanitary Sewer Project map for area near SW Murray Scholls Drive, SW Teal Boulevard, SW Murray Boulevard and SW Scholls Ferry Road.