List of capital improvement projects (CIP).
Status: Completed project
Project Category: Water
Project Estimated Cost: $500,000
MSTIP: This project will widen Jenkins Road between 158th and Murray to five lanes (two travel lanes in each direction with a center turn lane) and will include continuous bike and pedestrian facilities on both sides of the road. A dedicated right turn lane will be added on Jenkins Road westbound to 158th Avenue northbound. A new bridge is also being proposed at Cedar Mill Creek, just west of 153rd Avenue.https://www.co.washington.or.us/LUT/TransportationProjects/jenkins-road-from-158th-to-murray.cfm Water: Waterline construction will enable the transfer of water service from TVWD to the City of Beaverton within project limits. The construction includes approximately 1,200 feet of 16" diameter water line, and approximately 100 feet of waterline in the 8" to 12" diameter range. For the bridge crossing section, the 16" diameter line is placed within a 20" diameter steel casing pipe.Sanitary Sewer: No improvements or changesStorm Drain: The proposed storm drain system primarily serves the improved roadway thus it is a roadway expense.
Brion Barnett, 503-526-2592Mark BoguslawskiTamara Connolly, 503-350-4025mailboxengineering@beavertonoregon.gov
Completed
Making necessary utility improvements or repairs in conjunction with a MSTIP roadway project saves money and reduces the amount construction impacts to the public.