List of capital improvement projects (CIP).
Status: Future project
Project Category: Water
Project Estimated Cost: $85,000
Install larger vault with power and telemetry. Swap out Baily's PRV's for CLA-VAL.
Aaron Lee, 503-526-2446mailboxengineering@beavertonoregon.gov
On-Going
The existing vault is too small and in disrepair.