List of capital improvement projects (CIP).
Status: Future project
Project Category: Water
Project Estimated Cost: $75,000
PRV’s can be spooled and the vaults filled in and paved over.
Aaron Lee, 503-526-2446mailboxengineering@beavertonoregon.gov
FY 20-21: Complete design and construction.
Several existing PRVs are locked open or are placed in a no longer used pressure zone.