FTR 4199 - PRV Decommissioning

Status: Future project

Project Category: Water

Project Estimated Cost: $75,000

Project Description

PRV’s can be spooled and the vaults filled in and paved over.

Project Manager(s)

Aaron Lee, 503-526-2446
mailboxengineering@beavertonoregon.gov

Project Schedule

FY 20-21: Complete design and construction.

Project Justification

Several existing PRVs are locked open or are placed in a no longer used pressure zone.