CIP 4196 - 4050 SW Murray Blvd (Old KMart Site) Waterline Replacement

Status: Current project

Project Category: Water

Project Estimated Cost: $350,000

Project Description

The project consists of replacing roughly 1,100 lineal feet of 8" cast iron pipe with a 12" ductile iron pipe along the length of the west property line. There are also two fire hydrant assemblies connected to the old 8" cast iron pipe that will be replaced as they are failing.

Project Manager(s)

unassigned
mailboxengineering@beavertonoregon.gov

Project Schedule

FY19-20: City is working with engineering consultant, Pacific Community Design, to design the waterline replacement portion. Construction is anticipated to begin before FY20-21, but may overlap into FY20-21.
FY20-21: Construction completed in November of 2020.
FY21-22: Easements completed. As-builts submitted.

Project Justification

There is urgent need to have this new waterline installed as the existing 8” waterline was built in 1971 and has already shown significant signs of corrosion and pitting. This was discovered when Operations was asked by the Developer to make a tie-in to this existing system as required for their Site Development plans. Operations is not comfortable touching this waterline due to its condition.

Project Image(s)

CIP 4196 Water Project map for area bounded by SW 153rd Drive, SW Millikan Way, SW Murray Boulevard and SW Tualatin Valley Highway.