CIP 4188 - Chestnut Place (Oak - Elm)

Status: Current project

Project Category: Water

Project Estimated Cost: $447,000

Project Description

Construct 1,400 feet of 6-inch waterline on SW Chestnut Ave from SW Oak Pl to SW Elm Ave).

Project Manager(s)

Aaron Lee, 503-526-2446
mailboxengineering@beavertonoregon.gov

Project Schedule

FY 20-21: Begin Design.
FY 21-22: Finalize Design
FY 22-23: Refresh Design, advertise for construction

Project Justification

The existing water main is made of cast iron pipe and was constructed in 1959. This water main has experienced numerous breaks in recent years. Corrosive native soils have contributed to a much shorter useful life of the water pipe and fittings. Water Operations staff have rated this waterline a top priority replacement project. There are currently no fire hydrant on SW Elm Ave between Oak Pl and Chestnut Ave. TVF&R has requested the installation of two new hydrants to facilitate fire protection.