CIP 4173 - WWSP - SW Allen Blvd (WWSP - SW Allen Blvd)

Project Category: Water

Project Description

Install 3,000-ft of 16-in waterline

Project Manager(s)

David Winship, 503-350-2434
mailboxengineering@beavertonoregon.gov

Project Schedule

FY 19-20: Begin TVWD coordination and engineering design.

Project Justification

TVWD will be installing a 48-inch waterline connection to the WWSP that will provide water to their Metzger service area and provide a secondary feed to their Wolf Creek service area. The City plans to install a parallel 16-in waterline that will provide looping and resiliency to TVWD withdrawal Area 6 and the eastern edge of the City's existing water system. Constructing the two project simultaneously will provide cost savings and reduce impacts to City residents.