Status: Current project
Project Category: Water
Project Estimated Cost: $250,000
Install 350-ft of 12-in waterline across Denney Rd to replace an existing 10-in waterline.
Aaron Lee, 503-526-2446mailboxengineering@beavertonoregon.gov
FY 19-20: Project was delayed.FY 19-20: Begin preliminary design and site investigation.
The existing 10-in waterline that was constructed in 1979 is undersized and at the end of its useful life.