CIP 4139A - Replace Storm Pipe on 114th Ave South of McBride Pl

Status: Completed project

Project Category: Storm

Project Estimated Cost: $40,000

Project Description

Replace existing storm pipe with 320' of 10" PVC pipe, 83' of 12" PVC pipe, 5' of 12" DI pipe, and one (1) catch basin.

Project Manager(s)

unassigned
mailboxengineering@beavertonoregon.gov

Project Schedule

8-25-17: Meeting with Laneco to discuss scope and schedule.
8-30-17: Final plans completed.
9-6-17: Laneco provided price proposal.
9-7-17: Laneco accepted revised price proposal.