List of capital improvement projects (CIP).
Status: Completed project
Project Category: Water
Project Estimated Cost: $400,000
Construct 1700 feet of 6-inch and 8-inch waterline from Barlow Rd to Barlow Rd.
Aaron Lee, 503-526-2446mailboxengineering@beavertonoregon.gov
Design in progress
The existing water main is made of cast iron pipe and was constructed in 1967. This water main has experienced numerous breaks in recent years. Corrosive native soils have contributed to a much shorter useful life of the water pipe and fittings. Water Operations staff have rated this waterline a top priority replacement project.