List of capital improvement projects (CIP).
Status: Completed project
Project Category: Water
Project Estimated Cost: $200,000
Replace 1000 feet of 6-inch pipe and associated structures.
unassignedmailboxengineering@beavertonoregon.gov
FY16-17: Survey and design by City staff and begin construction by contract. FY17-18: Complete construction.
The cast iron pipe was constructed in 1969 and has experienced numerous main breaks in the past three years. Corrosive native soils may be contributing to a shorter useful life of water pipes and fittings than would typically be expected. City Water Forces have rated this waterline a priority replacement project.