CIP 4121 - Kimberly Ct (Murray Blvd - Hart Rd) Waterline Replacement

Status: Completed project

Project Category: Water

Project Estimated Cost: $200,000

Project Description

Replace 1000 feet of 6-inch pipe and associated structures.

Project Manager(s)

unassigned
mailboxengineering@beavertonoregon.gov

Project Schedule

FY16-17: Survey and design by City staff and begin construction by contract.
FY17-18: Complete construction.

Project Justification

The cast iron pipe was constructed in 1969 and has experienced numerous main breaks in the past three years. Corrosive native soils may be contributing to a shorter useful life of water pipes and fittings than would typically be expected. City Water Forces have rated this waterline a priority replacement project.