List of capital improvement projects (CIP).
Status: Completed project
Project Category: Water
Project Estimated Cost: $1,836,000
Replace 5,171 feet of waterline and associated structures in the Robinson and Greenway No. 5 subdivisions built in 1976 and 1977. Repair and replace 2,050 feet of storm drainage and 3,506 feet of sanitary sewer pipes and associated structures. Utility replacement in these subdivisions will require two phases.
unassignedmailboxengineering@beavertonoregon.gov
FY15/16: Conduct investigation to determine project scope and begin survey. FY16/17: Complete survey, determine phasing, and begin design of Phase 1. 6-10-16: Completed base map by City staff. 12-14-16: Contract with CES to provide base map for Greenway Ridge Townhomes. 12-16-16: 50% plans completed by City staff. Feb/Mar 2017: Potholing completed. 5-1-17: Greenway Ridge waterline replacement (CIP 4118) separated from CIP 4118A in order to insure that Greenway Ridge was completed in the summer of 2017. 6-9-17: Design for CIP 4118 completed. 6-21-17: CIP 4118 advertised. 6-28-17: CIP 4118 mandatory prebid meeting held. FY17/18: Design for CIP 4118A complete and project advertised on 9-20-17. Non-mandatory pre-bid for CIP 4118A on 9-27-17. CIP 4118 began on 8-14-17 and completed on 9-14-17. Bids opened for CIP 4118A on 10-25-17. Trench Line Excavation was the low bidder. Construction of CIP 4118A expected to begin on 12-4-17 and be complete on 4-30-18.
The cast iron waterline pipe was constructed in 1975 and has experienced numerous main breaks in the past three years. City Water Forces have rated this waterline a top replacement project. Corrugated metal storm pipe also needs repair as well as the elimination of root intrusion and ground water leaks in sanitary sewer pipes.