CIP 4117 - Washington Ave & 9th St 8-Inch Waterline

Project Category: Water

Project Estimated Cost: $166,000

Project Description

Construct 800 feet of 8-inch waterline on Washington Ave from 7th St to 9th St and on 9th St from Washington Ave to Hall Blvd.

Project Manager(s)

Aaron Lee, 503-526-2446
mailboxengineering@beavertonoregon.gov

Project Schedule

On-going

Project Justification

The existing 2" galvanized water main was constructed in 1948. This water main is undersized and corrosive native soils have contributed to a much shorter useful life of the water pipe and fittings. Water Operations staff have rated this waterline a top priority replacement project.

Project Image(s)

CIP 4117 Project Map of SW Washington Ave and 9th Street between SW Watson Ave and Hall Blvd.