List of capital improvement projects (CIP).
Project Category: Water
Project Estimated Cost: $166,000
Construct 800 feet of 8-inch waterline on Washington Ave from 7th St to 9th St and on 9th St from Washington Ave to Hall Blvd.
Aaron Lee, 503-526-2446mailboxengineering@beavertonoregon.gov
On-going
The existing 2" galvanized water main was constructed in 1948. This water main is undersized and corrosive native soils have contributed to a much shorter useful life of the water pipe and fittings. Water Operations staff have rated this waterline a top priority replacement project.