CIP NumberProject NameCategoryStatus
CIP 3106A Menlo Dr (Allen Blvd to Fairmount Dr) Sidewalk Transportation Completed project
CIP 3112 Allen Blvd/92nd Ave Shared Use Path Connection Transportation Current project
CIP 3113 Laurelwood Avenue Sidewalk (Scholls Ferry Rd – Laurelwood Ct) Transportation Current project
CIP 3201 Washington Square Adaptive Signal System Transportation Current project
FTR 3231 Millikan Way (Murray - Watson) Overlay Transportation Future project
FTR 3232 Allen Blvd/Erickson Avenue Intersection Improvement Transportation Future project
FTR 3233 Davies Road (135th Ave - Sorrento Rd) Sidewalk Transportation Future project
FTR 3234 Hall Blvd (Farmington Rd - Allen Blvd) Overlay Transportation Future project
FTR 3235 155th Ave (Davis Rd - Beverly Beach Ct) Transportation Future project
FTR 3236 Hall Blvd/Greenway Intersection Improvements Transportation Future project
FTR 3237 Center Street (117th St - Hall Blvd) Overlay Transportation Future project
CIP 3321 Westgate Dr/Cedar Hills Blvd/Dawson Wy Intersection Realignment Transportation Current project
CIP 3327 Millikan Wy Extension (Watson Av - Lombard Ave) MSTIP3E Transportation Current project
CIP 3328 Western Ave (BH Hwy-Allen Blvd) Improvement Transportation Current project
CIP 3329 Murray Blvd/Allen Blvd Intersection Improvement Transportation Current project
CIP 3340 All Roads Transportation Safety (ARTS) Project for Systemic Signal & Illumination Transportation Current project
CIP 3408 Hocken Ave (RR - TV Hwy) Widening Transportation Current project
CIP 3410 Shared Use Path along Denney Rd (King Blvd-Fanno Creek Trailhead) Transportation Completed project
CIP 3410A Beaverton Creek Trail (On-Street from King Blvd to Lombard Ave) Transportation Completed project
CIP 3412 BH Hwy Fiber Connection Transportation Completed project
CIP 3415 Barrows Rd/Murray Blvd Fiber Connection Transportation Current project
CIP 3416 Beaverton Quiet Zone Transportation Current project
CIP 3417 Shared Use Path (Fanno Creek Trail - Allen Blvd) Transportation Current project
CIP 3420 McKernan Creek Greenway Transportation Current project
CIP 3509 Public Safety Center Civic Completed project
CIP 3515B Broadway Streetscape Improvements (Watson Ave -Hall Blvd) Transportation Completed project
CIP 3519A Canyon Rd (Hocken Ave-Short St) Improvements, MTIP Transportation Current project
CIP 3521 Patricia Reser Center for the Arts Civic Completed project
CIP 3522 Library Fountain Improvements Civic Current project
CIP 3910 Village Ln Bridge Replacement Transportation Completed project
CIP 4021D Aquifer Storage and Recovery (ASR) Well No. 5 and Sorrento Pump Station Water Current project
FTR 4021F Aquifer Storage and Recovery (ASR) Well No. 6 Water Future project
CIP 4021G SCM Sterling Park Pump House & ASR 3a Water Current project
CIP 4021H Aquifer Storage and Recovery (ASR) Well No. 7 Water Current project
CIP 4046 Lloyd St Waterline (TV Hwy - Henry St) Water Completed project
CIP 4058A Cooper Mountain Reservoir #2 (5.5 MG) Water Current project
CIP 4058B Cooper Mountain Reservoir #3 (5.5 MG) Water Current project
CIP 4078C Sexton Mountain Pump Station Upgrade Water Current project
CIP 4107 Meridian Pump Station Replacement Water Current project
CIP 4109 Denney Rd (105th Ave - Rollingwood Dr and King Blvd - 111th Ave) 12-inch Waterline Water Completed project
CIP 4111 Hyland Area Waterline Replacements Water Completed project
CIP 4117 Washington Ave & 9th St 8-Inch Waterline Water
CIP 4118 Greenway Ridge 6-Inch Waterline Replacement Water Completed project
CIP 4118A Settler Wy Utility Replacements, Phase 1 Water Completed project
CIP 4118B Settler Wy Utility Replacements, Phase 2 Water Completed project
CIP 4120 Taralynn Ave (Allen Blvd - EOP) Waterline Replacement Water Current project
CIP 4121 Kimberly Ct (Murray Blvd - Hart Rd) Waterline Replacement Water Completed project
CIP 4122 Alvord Ln Waterline Extension Water Completed project
CIP 4123 Barlow Ct 6-Inch Waterline Water Completed project
CIP 4124 Lisa Ln 6-Inch Waterline Water Current project
CIP 4128A Cedar Hills Blvd/Jenkins Rd/Walker Rd Waterline Improvements Water Completed project
CIP 4128C 158th at Merlo and Connection to Jenkins Waterline Improvements Water Completed project
CIP 4132 27th Ct (Kimberly Ct - 142nd Ave) 6-Inch Waterline Water Completed project
CIP 4134 PRV Improvements at Davies Rd/Brockman Rd and Weir Rd/158th Ave Water
CIP 4134A PRV Improvements at 153rd Dr & Beaverton Creek TC and Division St & Village Pl Water Completed project
CIP 4135 Griffith Dr 8-Inch Waterline Water Current project
CIP 4136 22nd Ave (Dale Ave-Hall Blvd) 8-Inch Waterline Water Current project
CIP 4138 127th Ct (Allen Blvd - EOP) Waterline Replacement Water Completed project
CIP 4139 114th Ave (Canyon Rd-McBride Pl) 12-inch Waterline Replacement Water Completed project
CIP 4139A Replace Storm Pipe on 114th Ave South of McBride Pl Storm Completed project
CIP 4140 South Cooper Mtn 24-inch Waterline Extension Water Completed project
CIP 4141 WWSP Intertie at Cornelius Pass Rd & TV Hwy Water Completed project
CIP 4142 WWSP Intertie and Pump Station at Tile Flat Rd Water Current project
FTR 4143 JWC North Transmission Line (NTL) Intertie and Transmission Line Water Future project
CIP 4144 Spirea (Cherryhill Dr - Fischer) & Cherryhill Dr (Wilson - 20th/Azalea Ct) Waterline Replacement Water Completed project
CIP 4149 West Baseline Rd (158th St-170th Ave) Waterline Extension (TVWD Withdrawal Area 4) Water Current project
CIP 4151A 175th Transmission Main 24-Inch Winkleman Park to Alvord Ln Water
CIP 4151B Weir Rd 16-Inch Transmission Line 173rd to 165th Ave Water
CIP 4152 Chestnut Pl (BH Hwy-Cypress St) 8-Inch Waterline Replacement Water
CIP 4153 Denney Rd 12-Inch Waterline East of Rollingwood Dr Water Completed project
CIP 4155 Willamette Water Intake Facilities (WIF) Water Current project
CIP 4161 Area 6 - Denney Road Crossing at HWY 217th - Replacement of 400 LF with 12" Waterline Upsizing Water Current project
CIP 4168 Electric Ave 8-Inch Waterline Loop Water Completed project
CIP 4169A Nimbus North - Hall to Denney Commerce Center (System Upgrade) - Phase 1 Water Current project
CIP 4169B Nimbus North - Hall to Denney Commerce Center (System Upgrade) - Phase 2 Water Current project
CIP 4169C Nimbus North - Hall to Denney Commerce Center (System Upgrade) - Phase 3 Water Current project
CIP 4171 Master Meter (Schendel/Walker) Water Current project
CIP 4172 East Transmission Intertie - Nimbus to Western Ave (TVWD Opportunity Project) Water Current project
CIP 4173 WWSP - SW Allen Blvd (WWSP - SW Allen Blvd) Water
CIP 4174 East Transmission Intertie - SW Western Ave (TVWD Opportunity Project) Water Current project
CIP 4175 Five Oaks School, 173rd to NW 167th, 12" water line, 1500 LF Water Completed project
CIP 4176 Area within Murray/Wilson/Allen/Cherryhill in Quarter Section 3715
CIP 4177 9th St (Lombard to Alger) Water
CIP 4178 152nd Ave (City Limits to Davis) Water
CIP 4179 Glenbrook Rd (152nd - End) Water
CIP 4180 New Plymouth Lane (152nd to Shallowbrook) Water
CIP 4181 Shallowbrook Lane (David - 152nd) Water
CIP 4182 Trillium Lane (Shallowbrook Lane - Village Lane) Water
CIP 4183 Watson Ave (7th - 12th) Water
CIP 4184 9th St (Main - Watson) Water
CIP 4185 Washington Ave (5th - 7th) Water Completed project
CIP 4186 Harlequin Dr (South of Shelldrake Way) Water
CIP 4187 Erickson Trunk Waterline Improvements (6th - Farmington) Water
CIP 4188 Chestnut Place (Oak - Elm) Water Current project
CIP 4189 Spruce Lane (Royal Woodlands - Pine) Water
CIP 4190 Elm Ave (Chestnut - Old Scholls Ferry) Water
CIP 4191 Elm Ave (Royal Woodlands - Oak) Water
CIP 4192 Oak Street (Chestnut - Elm) Water
CIP 4193 9th St (Washington - Hall) Water
CIP 4194 209th Ave Water Pump Station Water Current project
CIP 4195 Barlow Road (Juniper - Jasmine) Waterline Water Completed project
CIP 4196 4050 SW Murray Blvd (Old KMart Site) Waterline Replacement Water Current project
CIP 4198 SW Wilson Ct (Kimberly - Hart) Waterline Replacement Water Current project
FTR 4199 PRV Decommissioning Water Future project
FTR 4200 163rd PRV Improvements Water Future project
FTR 4201 16599 SW Weir Rd PRV Improvements Water Future project
CIP 4231 Aquifer Storage and Recovery (ASR) Well No. 7a Water Current project
CIP 5088B Walker Rd Phase 2 (MSTIP) Water Current project
CIP 5089 Murray/Walker Intersection & Replacement Bridges, MSTIP 3D Transportation Current project
CIP 5090 Jenkins Road Widening (158th Ave-Murray Blvd) MSTIP with a City of Beaverton Waterline Extension Water Completed project
CIP 5095 US Hwy 26 at Cedar Hills Blvd Improvements Transportation Completed project
CIP 5099 Lot 2 Parking Garage Civic Current project
CIP 5105 Walker Rd (173rd Ave - 185th Ave), MSTIP3e Water Current project
CIP 5110 Wilson Dr (Allen Blvd - Hart Rd) Traffic Calming Transportation Completed project
CIP 5112 Sexton Mountain Dr (Murray Blvd - 155th Ave) Traffic Calming Transportation Completed project
CIP 5113 Denney Rd East of 111th Ave Crossing Improvement Transportation Completed project
CIP 5114 105th Ave Pedestrian & Bike Improvements Transportation Current project
CIP 5115 Pedestrian Crossing Improvement at 173rd Ave & Autumn Ridge Park Transportation Completed project
CIP 5116 Pedestrian Crossing Improvement at Barrows Rd & Barrows Park Transportation Completed project
CIP 5120 Hall-Watson Loop Improvements Transportation Current project
CIP 5210 Hall Blvd (Ridgecrest Dr - Hwy 217) Overlay Transportation Current project
CIP 6006 Erickson Trunk Sewer Upsizing (5th St - Allen Blvd), CWS R110 Sanitary Current project
CIP 6083 South Cooper Mountain Infrastructure Engineering Sanitary Completed project
CIP 6095 Sellwood Subdivision Utility Replacements Water Completed project
CIP 6096 Rollingwood Estates Utility Improvements Sanitary Current project
CIP 6100 McKay Subdivision Utility Improvements Phase 3 Sanitary
FTR 6101 Murrayhill Trunk Upsizing Sanitary Future project
FTR 6102 Village/Burntwood Utility Improvements Sanitary Future project
FTR 6103 Birchwood Sanitary Sewer Rehab Sanitary Future project
CIP 6104 Schiller & 84th Sanitary Sewer Rehab Sanitary Current project
CIP 6105 SW 131st, Barlow to Hanson, Sanitary Sewer Inflow and Infiltration Reduction Project Sanitary Current project
CIP 6107 Erickson Trunk Sewer and Water System - Ph. 2 Sanitary Current project
CIP 8098A Dover South Utility Rehabilitation Storm Current project
CIP 8098B Dover North Utility Rehabilitation Storm Current project
CIP 8101 Stormwater Drainage Master Plan Storm Current project
CIP 8119 141st Ave (Millikan Way to Vernier Driveway) Storm Conveyance Pipe Storm Completed project
CIP 8122 Major Storm Pipe Rehabilitation Project Storm Current project
CIP 8130 144th Ave Flood Remediation & Habitat Restoration Storm Completed project
CIP 8135B 4140 SW Watson Ave Stormwater Outfall to Beaverton Ck Retrofit Storm Current project
CIP 8141 SW 85th Ave – Ernst Rd Storm Project Storm Current project