Skip to Main Content
Capital Improvement Projects
List of Projects
Display:
All available projects
Current projects
Future projects
Completed projects
Capital Projects Map
All available projects
CIP Number
Project Name
Category
Status
CIP
3106A
Menlo Dr (Allen Blvd to Fairmount Dr) Sidewalk
Transportation
Completed project
CIP
3112
Allen Blvd/92nd Ave Shared Use Path Connection
Transportation
Current project
CIP
3113
Laurelwood Avenue Sidewalk (Scholls Ferry Rd – Laurelwood Ct)
Transportation
Current project
CIP
3201
Washington Square Adaptive Signal System
Transportation
Current project
FTR
3231
Millikan Way (Murray - Watson) Overlay
Transportation
Future project
FTR
3232
Allen Blvd/Erickson Avenue Intersection Improvement
Transportation
Future project
FTR
3233
Davies Road (135th Ave - Sorrento Rd) Sidewalk
Transportation
Future project
FTR
3234
Hall Blvd (Farmington Rd - Allen Blvd) Overlay
Transportation
Future project
FTR
3235
155th Ave (Davis Rd - Beverly Beach Ct)
Transportation
Future project
FTR
3236
Hall Blvd/Greenway Intersection Improvements
Transportation
Future project
FTR
3237
Center Street (117th St - Hall Blvd) Overlay
Transportation
Future project
CIP
3321
Westgate Dr/Cedar Hills Blvd/Dawson Wy Intersection Realignment
Transportation
Current project
CIP
3327
Millikan Wy Extension (Watson Av - Lombard Ave) MSTIP3E
Transportation
Current project
CIP
3328
Western Ave (BH Hwy-Allen Blvd) Improvement
Transportation
Current project
CIP
3329
Murray Blvd/Allen Blvd Intersection Improvement
Transportation
Current project
CIP
3340
All Roads Transportation Safety (ARTS) Project for Systemic Signal & Illumination
Transportation
Current project
CIP
3408
Hocken Ave (RR - TV Hwy) Widening
Transportation
Current project
CIP
3410
Shared Use Path along Denney Rd (King Blvd-Fanno Creek Trailhead)
Transportation
Completed project
CIP
3410A
Beaverton Creek Trail (On-Street from King Blvd to Lombard Ave)
Transportation
Completed project
CIP
3412
BH Hwy Fiber Connection
Transportation
Completed project
CIP
3415
Barrows Rd/Murray Blvd Fiber Connection
Transportation
Current project
CIP
3416
Beaverton Quiet Zone
Transportation
Current project
CIP
3417
Shared Use Path (Fanno Creek Trail - Allen Blvd)
Transportation
Current project
CIP
3420
McKernan Creek Greenway
Transportation
Current project
CIP
3509
Public Safety Center
Civic
Completed project
CIP
3515B
Broadway Streetscape Improvements (Watson Ave -Hall Blvd)
Transportation
Completed project
CIP
3519A
Canyon Rd (Hocken Ave-Short St) Improvements, MTIP
Transportation
Current project
CIP
3521
Patricia Reser Center for the Arts
Civic
Completed project
CIP
3522
Library Fountain Improvements
Civic
Current project
CIP
3910
Village Ln Bridge Replacement
Transportation
Completed project
CIP
4021D
Aquifer Storage and Recovery (ASR) Well No. 5 and Sorrento Pump Station
Water
Current project
FTR
4021F
Aquifer Storage and Recovery (ASR) Well No. 6
Water
Future project
CIP
4021G
South Cooper Mtn (Non-Potable Water) from ASR Well No. 3A
Water
Current project
CIP
4021H
Aquifer Storage and Recovery (ASR) Well No. 7
Water
Current project
CIP
4046
Lloyd St Waterline (TV Hwy - Henry St)
Water
Completed project
CIP
4058A
Cooper Mountain Reservoir #2 (5.5 MG)
Water
Current project
CIP
4058B
Cooper Mountain Reservoir #3 (5.5 MG)
Water
Current project
CIP
4078C
Sexton Mountain Pump Station Upgrade
Water
Current project
CIP
4107
Meridian Pump Station Replacement
Water
Current project
CIP
4109
Denney Rd (105th Ave - Rollingwood Dr and King Blvd - 111th Ave) 12-inch Waterline
Water
Completed project
CIP
4111
Hyland Area Waterline Replacements
Water
Completed project
CIP
4117
Washington Ave & 9th St 8-Inch Waterline
Water
CIP
4118
Greenway Ridge 6-Inch Waterline Replacement
Water
Completed project
CIP
4118A
Settler Wy Utility Replacements, Phase 1
Water
Completed project
CIP
4118B
Settler Wy Utility Replacements, Phase 2
Water
Completed project
CIP
4120
Taralynn Ave (Allen Blvd - EOP) Waterline Replacement
Water
Current project
CIP
4121
Kimberly Ct (Murray Blvd - Hart Rd) Waterline Replacement
Water
Completed project
CIP
4122
Alvord Ln Waterline Extension
Water
Completed project
CIP
4123
Barlow Ct 6-Inch Waterline
Water
Completed project
CIP
4124
Lisa Ln 6-Inch Waterline
Water
Current project
CIP
4128A
Cedar Hills Blvd/Jenkins Rd/Walker Rd Waterline Improvements
Water
Completed project
CIP
4128C
158th at Merlo and Connection to Jenkins Waterline Improvements
Water
Completed project
CIP
4132
27th Ct (Kimberly Ct - 142nd Ave) 6-Inch Waterline
Water
Completed project
CIP
4134
PRV Improvements at Davies Rd/Brockman Rd and Weir Rd/158th Ave
Water
CIP
4134A
PRV Improvements at 153rd Dr & Beaverton Creek TC and Division St & Village Pl
Water
Completed project
CIP
4135
Griffith Dr 8-Inch Waterline
Water
Current project
CIP
4136
22nd Ave (Dale Ave-Hall Blvd) 8-Inch Waterline
Water
Current project
CIP
4138
127th Ct (Allen Blvd - EOP) Waterline Replacement
Water
Completed project
CIP
4139
114th Ave (Canyon Rd-McBride Pl) 12-inch Waterline Replacement
Water
Completed project
CIP
4139A
Replace Storm Pipe on 114th Ave South of McBride Pl
Storm
Completed project
CIP
4140
South Cooper Mtn 24-inch Waterline Extension
Water
Completed project
CIP
4141
WWSP Intertie at Cornelius Pass Rd & TV Hwy
Water
Completed project
CIP
4142
WWSP Intertie and Pump Station at Tile Flat Rd
Water
Current project
FTR
4143
JWC North Transmission Line (NTL) Intertie and Transmission Line
Water
Future project
CIP
4144
Spirea (Cherryhill Dr - Fischer) & Cherryhill Dr (Wilson - 20th/Azalea Ct) Waterline Replacement
Water
Completed project
CIP
4149
West Baseline Rd (158th St-170th Ave) Waterline Extension (TVWD Withdrawal Area 4)
Water
Current project
CIP
4151A
175th Transmission Main 24-Inch Winkleman Park to Alvord Ln
Water
CIP
4151B
Weir Rd 16-Inch Transmission Line 173rd to 165th Ave
Water
CIP
4152
Chestnut Pl (BH Hwy-Cypress St) 8-Inch Waterline Replacement
Water
CIP
4153
Denney Rd 12-Inch Waterline East of Rollingwood Dr
Water
Completed project
CIP
4155
Willamette Water Intake Facilities (WIF)
Water
Current project
CIP
4161
Area 6 - Denney Road Crossing at HWY 217th - Replacement of 400 LF with 12" Waterline Upsizing
Water
Current project
CIP
4168
Electric Ave 8-Inch Waterline Loop
Water
Completed project
CIP
4169A
Nimbus North - Hall to Denney Commerce Center (System Upgrade) - Phase 1
Water
Current project
CIP
4169B
Nimbus North - Hall to Denney Commerce Center (System Upgrade) - Phase 2
Water
Current project
CIP
4169C
Nimbus North - Hall to Denney Commerce Center (System Upgrade) - Phase 3
Water
Current project
CIP
4171
Master Meter (Schendel/Walker)
Water
Current project
CIP
4172
East Transmission Intertie - Nimbus to Western Ave (TVWD Opportunity Project)
Water
Current project
CIP
4173
WWSP - SW Allen Blvd (WWSP - SW Allen Blvd)
Water
CIP
4174
East Transmission Intertie - SW Western Ave (TVWD Opportunity Project)
Water
Current project
CIP
4175
Five Oaks School, 173rd to NW 167th, 12" water line, 1500 LF
Water
Completed project
CIP
4176
Area within Murray/Wilson/Allen/Cherryhill in Quarter Section 3715
CIP
4177
9th St (Lombard to Alger)
Water
CIP
4178
152nd Ave (City Limits to Davis)
Water
CIP
4179
Glenbrook Rd (152nd - End)
Water
CIP
4180
New Plymouth Lane (152nd to Shallowbrook)
Water
CIP
4181
Shallowbrook Lane (David - 152nd)
Water
CIP
4182
Trillium Lane (Shallowbrook Lane - Village Lane)
Water
CIP
4183
Watson Ave (7th - 12th)
Water
CIP
4184
9th St (Main - Watson)
Water
CIP
4185
Washington Ave (5th - 7th)
Water
Completed project
CIP
4186
Harlequin Dr (South of Shelldrake Way)
Water
CIP
4187
Erickson Trunk Waterline Improvements (6th - Farmington)
Water
CIP
4188
Chestnut Place (Oak - Elm)
Water
Current project
CIP
4189
Spruce Lane (Royal Woodlands - Pine)
Water
CIP
4190
Elm Ave (Chestnut - Old Scholls Ferry)
Water
CIP
4191
Elm Ave (Royal Woodlands - Oak)
Water
CIP
4192
Oak Street (Chestnut - Elm)
Water
CIP
4193
9th St (Washington - Hall)
Water
CIP
4194
209th Ave Water Pump Station
Water
CIP
4195
Barlow Road (Juniper - Jasmine) Waterline
Water
Completed project
CIP
4196
4050 SW Murray Blvd (Old KMart Site) Waterline Replacement
Water
Current project
CIP
4198
SW Wilson Ct (Kimberly - Hart) Waterline Replacement
Water
Current project
FTR
4199
PRV Decommissioning
Water
Future project
FTR
4200
163rd PRV Improvements
Water
Future project
FTR
4201
16599 SW Weir Rd PRV Improvements
Water
Future project
CIP
4231
Aquifer Storage and Recovery (ASR) Well No. 7a
Water
Current project
CIP
5088B
Walker Rd Phase 2 (MSTIP)
Water
Current project
CIP
5089
Murray/Walker Intersection & Replacement Bridges, MSTIP 3D
Transportation
Current project
CIP
5090
Jenkins Road Widening (158th Ave-Murray Blvd) MSTIP with a City of Beaverton Waterline Extension
Water
Completed project
CIP
5095
US Hwy 26 at Cedar Hills Blvd Improvements
Transportation
Completed project
CIP
5099
Lot 2 Parking Garage
Civic
Current project
CIP
5105
Walker Rd (173rd Ave - 185th Ave), MSTIP3e
Water
Current project
CIP
5110
Wilson Dr (Allen Blvd - Hart Rd) Traffic Calming
Transportation
Completed project
CIP
5112
Sexton Mountain Dr (Murray Blvd - 155th Ave) Traffic Calming
Transportation
Completed project
CIP
5113
Denney Rd East of 111th Ave Crossing Improvement
Transportation
Completed project
CIP
5114
105th Ave Pedestrian & Bike Improvements
Transportation
Current project
CIP
5115
Pedestrian Crossing Improvement at 173rd Ave & Autumn Ridge Park
Transportation
Completed project
CIP
5116
Pedestrian Crossing Improvement at Barrows Rd & Barrows Park
Transportation
Completed project
CIP
5120
Hall-Watson Loop Improvements
Transportation
Current project
CIP
5210
Hall Blvd (Ridgecrest Dr - Hwy 217) Overlay
Transportation
Current project
CIP
6006
Erickson Trunk Sewer Upsizing (5th St - Allen Blvd), CWS R110
Sanitary
Current project
CIP
6083
South Cooper Mountain Infrastructure Engineering
Sanitary
Completed project
CIP
6095
Sellwood Subdivision Utility Replacements
Water
Completed project
CIP
6096
Rollingwood Estates Utility Improvements
Sanitary
Current project
CIP
6100
McKay Subdivision Utility Improvements Phase 3
Sanitary
FTR
6101
Murrayhill Trunk Upsizing
Sanitary
Future project
FTR
6102
Village/Burntwood Utility Improvements
Sanitary
Future project
FTR
6103
Birchwood Sanitary Sewer Rehab
Sanitary
Future project
CIP
6104
Schiller & 84th Sanitary Sewer Rehab
Sanitary
Current project
CIP
6107
Erickson Trunk Sewer and Water System - Ph. 2
Sanitary
Current project
CIP
8098A
Dover South Utility Rehabilitation
Storm
Current project
CIP
8098B
Dover North Utility Rehabilitation
Storm
Current project
CIP
8101
Stormwater Drainage Master Plan
Storm
Current project
CIP
8119
141st Ave (Millikan Way to Vernier Driveway) Storm Conveyance Pipe
Storm
Completed project
CIP
8122
Major Storm Pipe Rehabilitation Project
Storm
Current project
CIP
8130
144th Ave Flood Remediation & Habitat Restoration
Storm
Completed project
CIP
8135B
4140 SW Watson Ave Stormwater Outfall to Beaverton Ck Retrofit
Storm
Current project