CIP 8098B - Dover North Utility Rehabilitation

Status: Current project

Project Category: Storm

Project Estimated Cost: $570,000

Project Description

Rehabilitate, replace, and/or realign sanitary sewer and storm drain pipes that are both old and difficult to access for maintenance.

Project Manager(s)

Tristan Wear, 503-350-4059
mailboxengineering@beavertonoregon.gov

Project Schedule

FY15/16 through FY16/17: Project placed on hold
FY17-18: Continue project design
FY18-19: Continue design
FY 19-20: Project assigned to new Project Manager
FY 20-21: Begin investigation
FY 21-22: Design
FY 22-23: Construction

Project Justification

Storm Drainage: Existing pipes are in need of repair and are difficult to access because they are along side yards (some pipes are even under existing structures). The scope of the Dover Ln storm drainage improvements has expanded because nearly all of the storm system on Dover Ln and adjacent streets is in need of rehabilitation or replacement. There are now two projects: Dover South (CIP 8098A) and Dover North (CIP 8098B).

Sanitary Sewer: The sanitary sewer pipe is made from transite and reached the end of its useful life. The bottoms of the lines have eroded and there are many joints that have separated or failed. Wastewater from this area flows into the City of Portland’s collection system making it ineligible for sewer lateral replacement under the CWS I & I reduction program.

Project Image(s)

CIP 8098B Project Map for area east of SW Oleson Rd including SW Dover St, Dover Ct and Dover Ln.