CIP 4198 - SW Wilson Ct (Kimberly - Hart) Waterline Replacement

Status: Current project

Project Category: Water

Project Estimated Cost: $503,000

Project Description

Construct 630 feet of 6-inch waterline on SW Wilson Ct from SW Kimberly Ct to SW Hart Rd. Construct 400 feet of 12-inch waterline and 15 feet of 8-inch waterline on SW Hart Rd from SW Murray Blvd to SW Kimberly Dr. Construct 510 feet of 8-inch waterline on SW Wilson Dr from SW Hart Rd, moving south. Construct 70 feet of 6-inch waterline on SW Kimberly Dr from SW Hart Rd, moving south.

Project Manager(s)

Aaron Lee, 503-526-2446
Marisa Cummins, 503-629-6434
mailboxengineering@beavertonoregon.gov

Project Schedule

FY 21-22: Begin design.
FY 21-22: Finalize design
FY 22-23 Refresh Design, advertise for construction

Project Justification

The existing water main is made of cast iron pipe and was constructed in 1969. This water main has experienced numerous breaks in recent years. Corrosive native soils have contributed to a much shorter useful life of the water pipe and fittings. Water Operations staff have rated this waterline a top priority replacement project.

Project Image(s)

CIP 4198 Water Project map of SW Wilson Court area bounded by SW Murray Blvd, SW Barlow Road, SW 142nd Avenue and SW Hart Road.

CIP 4198 Water Project map of SW Wilson Court area bounded by SW Murray Blvd, SW Barlow Road, SW 142nd Avenue and SW Hart Road.