Project Category: Water
Project Estimated Cost: $500,000
This project is a water pumping station that was included in the recommended improvements to the City's "Water System Facility Plan" (master plan) as a means of increasing the flow of water without increasing the diameter size of the existing transmission line from the water treatment plant to the City's water distribution system. In 1995, Brown and Caldwell estimated that the pump station could increase the transmission line capacity to the City to approximately 18 MGD. Project is located on 36" transmission line near 209th Ave and TV Hwy.
David Winship, 503-350-2434Sergey Dezhnyuk, 503-526-2792mailboxengineering@beavertonoregon.gov
Project is delayed pending completion and testing of the Hillsboro/TVWD Northside Transmission Line to determine available capacity in the existing Southside transmission line so that detrimental impacts to Hillsboro and TVWD are not caused. Additionally, alternative solutions to increase transmission capacity are to be analyzed before a pump station is justified.
Necessary to increase the quantity of water supply to the City and postpone the major expenditure for a second water transmission line.